NDIS Home Modifications Start With the Occupational Therapist’s Report

You already have the most important document: the occupational therapist’s report. It’s the page that says what you need and why. Everything else in NDIS home modifications grows out of it.

This post turns that report into a short list of steps. It runs from the report to a finished rail, ramp or bathroom, and it tells you what to gather along the way.

First, the basics. Home modifications are changes to your home that help you manage your disability. The NDIA funds the ones that meet its funding criteria. It looks at the assessment, the owner’s written approval and, for complex work, two itemised quotes. And nothing should be spent before the modification is funded in your plan.

One scope line. This is general information as at 8 June 2026, based on the NDIA’s guideline, Our Guideline: Home modifications (June 2025 version). Your plan and the NDIA’s decision govern.

What counts as a home modification

The guideline describes home modifications as changes to your home that help you manage your disability. They’re either minor or complex, depending on cost and risk. A grab rail is minor. A new stepless shower is not.

Two rules sit behind that.

Since 1 October 2024, the NDIS supports list in the Transitional Rules has named “Home modification design and construction”. It covers supports that “design, change or modify a participant’s home to help the participant live as independently as possible and to live safely at home”.

The same rules treat home modifications that don’t comply with the law, the National Construction Code or mandated Australian standards as unlawful goods and services (Schedule 2, item 23). Those aren’t NDIS supports. In plain terms, the work has to be lawful and built to code.

Minor or complex: the category decides the paperwork

The guideline sorts work into three groups. The group decides who writes the assessment and whether you need quotes. Every figure in the table comes from the NDIA’s guideline (June 2025 version).

Home modification categories in the NDIA guideline, June 2025 version

Category Cost and type (guideline) Who assesses Quotes
Minor, Category A Under $10,000; non-structural, low risk, 1 or 2 areas Any occupational therapist, including your usual one Usually none; set NDIS budget; a quote in MMM6 or MMM7 areas
Minor, Category B $10,000 to $20,000, or minor modifications to a bathroom floor A home modification assessor As Category A; 2 independent itemised quotes to ask for a higher budget
Complex Usually structural or custom-built; higher risk or cost; usually needs building approvals; non-structural work over $20,000 or extensive may also be complex A home modification assessor independent of any builder quoting 2 itemised quotes

Read the table across, one row at a time. Start with the Category A row. A job under $10,000 that’s non-structural and low risk goes to your usual therapist, usually needs no quote and draws on a set budget. Now look at the complex row. Everything gets heavier: an independent assessor, 2 itemised quotes and, usually, building approvals.

Minor work is non-structural, low risk, covers one or two areas and costs less than $20,000 in total. Minor work is funded from a set NDIS budget based on market costs.

You may see a different figure on the NDIS website. Its page “What are home modifications?”, in a copy archived on 5 May 2026, says minor home modifications generally cost less than $25,000 in total, and complex ones generally more. The guideline is the more detailed document, and its Category A and B limits are what decide who assesses the work and whether you need quotes, so those are the figures used here. If your job falls between $20,000 and $25,000, ask the NDIA which figure it is applying to your plan.

Complex work is the bigger end. The guideline’s examples include permanent ramps over $10,000 that need a building permit, structural bathroom changes such as a stepless shower, extensive electrical or plumbing work, work on load-bearing walls, and lifts over $10,000 that need a permit. Whether something counts as structural can depend on your state or territory, so ask your assessor.

How do you tell which group your job is in? Ask your occupational therapist early. Cost is the first clue: under $10,000 points to Category A, and $10,000 to $20,000 points to Category B. Minor work to a bathroom floor is Category B too. If the job is structural, custom-built or likely to need building approvals, expect complex.

A common complaint online is that the reports cost more than the work, and that the whole process is red tape. Some families add that therapists move on, which makes continuity hard. The guideline’s answer is to scale the evidence to the category, and Category A is deliberately light. Complex work does need more evidence and takes longer, and the guideline says so. The checklist below helps with the delays you can control. One easy habit: keep a copy of every report.

Who can write the assessment

For Category A, any occupational therapist can do the assessment, including your usual one. That makes it the easiest start. If you don’t have one yet, you can look through the occupational therapists listed on this site.

For Category B and complex work, the NDIA needs a home modification assessor. That’s an occupational therapist who’s qualified to recommend more detailed home modification supports. For complex work the assessor should be independent of the builders quoting. The idea is simple: the person recommending the work shouldn’t be the one building it.

You might spot something odd in the guideline. One sentence says, “For all minor home modifications, you need an assessment from a home modification assessor.” The paragraphs straight after it are more specific. They say any occupational therapist can assess Category A, and a home modification assessor is needed for Category B. The guideline’s own worked example follows the specific rule.

So here’s the ruling. The category-specific rule governs, because it’s the more specific provision and the worked example repeats it. The general sentence is looser than the detail.

The guideline also covers the cost of the assessment itself. It describes initial funding for 2 to 10 hours in your Capacity Building budget. Ask your therapist how many hours they expect the report to take, and get that in writing. Then you can match it against the 2 to 10 hours.

The approvals to gather first

A word before the list. The guideline says you shouldn’t spend any money on home modification supports before they’re funded in your plan, if you want the NDIA to fund them. The approvals come first too. The order is approvals, then funding, then spending. If you spend first, you’re taking a risk with your own money.

Gather these before the NDIA will consider funding:

  • Written approval from the legal owner of the home.
  • If the home has shared ownership, approval from the body corporate or owners corporation.
  • If there’s a mortgage, a check with your mortgage provider about whether they need to approve.
  • If you rent, a written note to the NDIA saying whether the landlord will want the work removed when you leave.

The guideline is plain about who does the chasing: you are responsible for getting these approvals and permissions. Get each one in writing, and keep a copy with the report. A spoken yes is hard to prove later.

On the renting point, removal may be funded, as long as the NDIA agrees to it before it funds the modification. So raise it early.

There’s also a value-for-money test. Minor work is likely to be value for money if you plan to stay in your home or have a lease of at least 12 months. For complex work, the guideline looks for at least 3 years.

Quotes and budgets

This is the part that surprises people, because for minor work you usually don’t need a quote at all.

The set budget for minor work is based on market costs. So the NDIA usually doesn’t ask for a quote. Keep any quotes you do collect, though, because they’re useful for warranties and audits.

There are two times a minor job needs one:

  • In MMM6 or MMM7 areas, which the guideline describes as remote or very remote.
  • When you want to ask for a higher budget than the set one. That takes 2 independent itemised quotes.

Complex work is different. The guideline asks for 2 itemised quotes. Itemised means each part of the work is priced separately.

One practical tip. Give every builder the same report, so the quotes are for the same job. Then they’re easy to line up side by side.

Take a minor job as an example. Say a household needs a grab rail beside the shower and lever taps. That’s the guideline’s own Category A example, so their usual occupational therapist can write the assessment. There’s no quote to collect unless they live in an MMM6 or MMM7 area. The owner signs a written approval. A licensed, insured tradesperson does the work. If the plumbing touches the wet seal, a plumbing certificate is issued. The final payment goes last, once the work is finished and the certificate is in hand.

Choosing who does the work

The guideline asks for a licensed tradesperson with the appropriate qualifications and insurance. You’re the one who checks the credentials, so ask to see them before you sign anything. That means the licence, the qualifications and the insurance. Write down the licence number and the name of the insurer, so the details are on file.

You can browse the builders listed in the directory. A listing isn’t a licence, so check the licence and insurance yourself.

Your funding type changes who you can use. If your funding is agency-managed, you need NDIS-registered providers. If it’s self-managed or plan-managed, you can use unregistered providers who have the right qualifications. The directory’s NDIS providers are a place to begin, and registration is worth confirming directly.

Whoever you choose, get the agreement in writing. It should say what will be done, the price and the stage payments. If you’re comparing two builders, check that both agreements describe the same work as the report, or you’ll be comparing different jobs.

Permits, certificates and payments

Some work needs council approval. You and the builder are responsible for the approvals and permits that apply. Ask the builder which ones are needed before work starts.

Then there are certificates. An electrical job needs an electrical certificate of compliance. A job that touches what the guideline calls the “wet seal”, the waterproofing in a bathroom, needs a plumbing certificate. Both should be in your hands before the final stage payment. Keep copies with the report and your plan, so you can find them if anyone asks later.

Payments need care. A stage payment is a part payment made as the job reaches an agreed point. Tell the NDIA early if the job will be paid in stages. And don’t agree to pay all of the money, or a final stage payment, before the work is complete and before any certification has been received.

The NDIA isn’t a party to the building contract. That contract is between you and the builder, which is one more reason to keep it in writing.

If something goes wrong

Start with the builder. After that, these are the options:

  • Raise the problem with the builder, in writing if you can. Say what’s wrong and what you’d like done.
  • The NDIS Commission handles complaints about registered providers. That’s the place to go if your builder is one.
  • The Australian Consumer Law may apply to the work, so it’s worth knowing your rights as a customer.
  • Your state building authority is another option for building problems.

From Report to Finished Rail

The whole journey fits in seven lines.

  • Report: start with the occupational therapist’s report.
  • Category: A, B or complex decides the paperwork.
  • Approvals: owner, body corporate, mortgage provider and landlord, where they apply.
  • Quotes: only if your category or your budget request needs them.
  • Builder: licensed, insured and agreed in writing.
  • Certificates: electrical and plumbing, where the job needs them.
  • Final payment: last, after completion and certification.

Complex jobs add to the list and don’t change it. You still need the report and the approvals. You also need an assessor who’s independent of the builders, and 2 itemised quotes.

If the NDIA’s decision about your plan looks wrong, you can ask for an internal review within 3 months of getting the plan.

You could copy the list into your phone and tick each line off as you go. Then you’ll always know which step is next, and which ones are done.

Pick the step you’re on and start there. The rest can wait until you reach it.

Sources: National Disability Insurance Agency, Our Guideline: Home modifications, June 2025 version (https://www.ndis.gov.au/media/7795/download?attachment); National Disability Insurance Scheme (Getting the NDIS Back on Track No. 1) (NDIS Supports) Transitional Rules 2024, Schedule 1 item 22 and Schedule 2 item 23 (https://www.legislation.gov.au/F2024L01257/asmade/text); National Disability Insurance Scheme, What are home modifications? (https://www.ndis.gov.au/participants/home-and-living/modifying-your-home/what-are-home-modifications)